http://www.youtube.com/watch?v=QehZjjwb7-I&feature=related
This is the scene when the Joker intrudes into the conversation between the dealers inside a restaurant kitchen. Joker introduces himself by making laughing sounds 'ha ha ha ho he ho ha'. His tone is pretty much mocking their ability to do work behind the Batman. He keeps himself cool within the group as he shows them a magic trick. By plunging the person into the pencil, it suggest he is very strong in person.
The beard man is surprised, realizes the Joker is not any ordinary man, and allows him to have a word into the conversation. By negotiating with the two gangs, the Joker is trying to build up his authority to take on the Batman. He also mocks the chinaman who he names him as 'squeeler' and warns the two gangs to believe in him rather than Mr Lau. The Joker announces he wants half if the Batman is killed which made Gambol furious. In defence from being attacked, he reveals he's loaded with bombs. Through this, we can tell that The Joker is very intelligient.
Saturday, April 25, 2009
Thursday, April 23, 2009
Reverse Engineer Editing
After last week's under-terrible-condition filming in Sai Kung country side, we can now work on the editing for the clip. The filming was actually done quite well, firstly because Kelly found a really good place for us to film behind the back of her house. It looked very similar to the actual setting of the movie so were quite happy with that. On the other hand, we asked Monique to help us with the role in Little Chinese Seamstress since she can speak fluent Mandarin. This helped us on the accuracy with the real clip we were basing on.
It didn't take us too long, 2 hours to be exact, to complete the filming. In the beginning, it was quite hard to concentrate tin actually becoming the characters in the clip, it wasn't natural for what we were doing. We had series of laughing which halted the development of our acting. After when we finally put in some serious concentration, what ended up was actually quite successful.
Today, we are supposed to do some editing until next lesson. But the clips that are going to be distributed between the 3 of us, is taking ages to copy and paste. I may need to stay afterschool sometime next week to complete the editing.
It didn't take us too long, 2 hours to be exact, to complete the filming. In the beginning, it was quite hard to concentrate tin actually becoming the characters in the clip, it wasn't natural for what we were doing. We had series of laughing which halted the development of our acting. After when we finally put in some serious concentration, what ended up was actually quite successful.
Today, we are supposed to do some editing until next lesson. But the clips that are going to be distributed between the 3 of us, is taking ages to copy and paste. I may need to stay afterschool sometime next week to complete the editing.
Friday, April 10, 2009
Film Extended Essay
Sequence Films
Films:
- Why they are done
- The impact in different genres
- What attracts audience
- Reviews from critics of different sequence films
Films:
- Infernal Affairs
- Bourne Trilogy
- Home Alone
- Matrix
- Star Wars
Wednesday, April 1, 2009
Pre-Filming Organization
We finalized on our project today, but not completely confirmed on the date of the filming since Kelly isn't in class. Our arrangements so far is that we should meet up twice; dates of Tues 7th Apr and Tues 14th Apr or Mon 13th Apr and Wed 15th Apr.
Jay will be carrying our camera and I'll be taking the tri-pod with me. We mustn't damage the machineries up or else we'll need to pay for them.
Hope it goes successful.
Jay will be carrying our camera and I'll be taking the tri-pod with me. We mustn't damage the machineries up or else we'll need to pay for them.
Hope it goes successful.
Subscribe to:
Posts (Atom)