Thursday, March 26, 2009
Reverse Engineering Continued
In today's lesson, we worked with close analysis on the clip. Split the work between us three, Jay listened and wrote the script, Kelly worked on the setting of the scene and what the characters are wearing and I closely looked at each second, what things happen. I think we would be able to start drawing a storyboard and also the filming I think shouldn't take us really long. During the easter holidays, we should meet up at least twice at filming.
Friday, March 13, 2009
Reverse Engineering Early Planning (Mr Dickson)
This project is one of the last projects before the actual assessment. In this project, we are to select a clip that is simple, easy-going in real life and we'll need to imitate exactly how it is performed by the actual casts.
Group:
Looked at so far:
Balzac
Mr Bean
Some other one I forgot.
Group:
- Jay
- Kelly
- Winston
Looked at so far:
Balzac
Mr Bean
Some other one I forgot.
Subscribe to:
Posts (Atom)